{"id":525,"date":"2013-03-31T11:26:56","date_gmt":"2013-03-31T11:26:56","guid":{"rendered":"http:\/\/gtsusainc.com\/?page_id=525"},"modified":"2013-04-26T13:22:44","modified_gmt":"2013-04-26T13:22:44","slug":"project-engineering","status":"publish","type":"page","link":"https:\/\/gtsusainc.com\/?page_id=525","title":{"rendered":"Project Engineering"},"content":{"rendered":"<p>\n\t<b>MECHANICAL<\/b>\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<p>\n\t<b>HVAC<\/b>\n<\/p>\n<ul>\n<li>\n\t\t<b>High Side<\/b>\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment Selections\/ Specifications\/ Sizing\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Plant\/ Equipment room coordinated layouts with two line piping, panels, wiring etc.\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Plant Loop System design\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment Schedule and BOM\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<ul>\n<li>\n\t\t<b>Low Side<\/b>\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Air System Design<\/b>\n<\/p>\n<ul>\n<li>\n\t\tHeat Load Estimation\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Trane Tracer\/ E-20 II HAP method used for commercial buildings\/ standard systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Low RH areas\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; High RH areas\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; High Sensible Load Applications\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 100% fresh air systems etc.\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tAir Distribution System types\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Single zone (constant volume\/ single unit)\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Single zone\/ multiple terminal units like FCUs, PKC etc.\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Multi-zone, variable volume systems with VAVs\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Once through systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Air System Design<\/b> contd&hellip;\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tAir Distribution System: Duct Design Pressures\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Low Pressure Ducting\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Medium Pressure Ducting\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; High Pressure Ducting\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tDuct Fabrication Standards\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; SMACNA\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; DW144\/ DW143\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tAir-conditioned Room Pressures\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Normal pressure\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Positive pressure rooms like clean rooms (designed as per FS 209E and ISO 14644 Classification Standards), operation theaters, isolation rooms etc.\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Negative pressure rooms like isolation rooms, vaccination\/ viral\/ bio-production areas etc.\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tAir Handling Unit Design\/ Configurations\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; For Cooling\/ Heating\/ Humidification\/ De-humidification\/ Heat recovery\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Single fan\/ Two fan systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Air Filtration Systems like HEPA filters (0.3\/ 0.12 microns), Microvee filters (5\/ 3 microns), Pre filters (20 microns) etc.\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Control System P&amp;I and Operation Logic\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<p>\n\t<b>Air System Design Highlights<\/b>\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Coordinated ducting layout drawings and AHU room layouts on AutoCAD\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Interference checking on 2D\/3D\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Air side pressure drop calculations\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design\/ Drafting software used to prepare layout drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Production Wizard software &#8211; an ERP\/ BOM processor used to generate Bill of Materials based on G.I. coil width for fabricating the ducts. The software can accept output file from AutoCAD in any format\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Control loops and P&amp;I diagram with logic\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\t<b>Low Side <\/b>contd&hellip;\n\t<\/li>\n<\/ul>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <b>Water Piping System Design<\/b>\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<ul>\n<li>\n\t\tChilled water\/ Condenser water\/ Hot water\/ Dual temperature water systems design\n\t<\/li>\n<\/ul>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tClosed water systems design categories\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Constant flow or Variable flow\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Direct return or Reverse return water systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Two pipe or Four pipe water systems for Dual temperature systems\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tPlant Building Loop combination (primary\/ secondary pumping systems)\n\t<\/li>\n<li>\n\t\tPlant Distribution Building Loop combination\n\t<\/li>\n<li>\n\t\tSpecifications\/ selection &amp; sizing\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Pumps for Constant volume\/ Variable volume pumping systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Control valves\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Piping, valves &amp; pipe accessories\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Cooling towers\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Expansion tank\/ compression tank (closed expansion tank)\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\tDesign of Control Systems for plant building loop and plant distribution building loop combinations\n\t<\/li>\n<\/ul>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<b>Water Piping System Design Highlights<\/b>\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Construction\/ shop drawing:\n<\/p>\n<ul>\n<li>\n\t\tCoordinated equipment\/ piping layout drawings with interference check on 2D\/3D\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Calculation of water side pressure drop\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment schedules with specifications\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; BOM with specifications based on final drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Schematic piping layout drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Control loops and P&amp;I diagrams with logic\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<b>MECHANICAL<\/b>\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<p>\n\t<b>Fire Protection System (FPS)<\/b>\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; FPS design including smoke exhaust system\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment selection\/ sizing &amp; specifications\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Coordinated plant\/ equipment room layout with two line piping, pumps etc.\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Wet riser\/ dry riser sizing, coordinated layout drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sprinkler piping selection\/ layout drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Smoke exhaust ducting design &amp; coordinated layout drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Design details of fire dampers including sizing\/ location &amp; installation details for air distribution systems\/ duct layouts\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Operation logic &amp; control systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Bill of Materials (BOM)\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<b>PLUMBING<\/b>\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<ul>\n<li>\n\t\tDesign &amp; engineering of :\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Domestic &amp; Process Water supply systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Water Drainage &amp; Sewage systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Steam piping\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Gaseous Systems\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Plumbing sizes\/ coordinated layout drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment selection\/ specifications\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Pressure drop calculations\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Bill of Materials\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<p>\n\t<b>ELECTRICAL<\/b>\n<\/p>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<ul>\n<li>\n\t\tDesign of Electrical distribution systems (High Voltage\/ Low Voltage)\n\t<\/li>\n<li>\n\t\tElectrical load list indicating critical loads and single line diagrams including emergency supply\n\t<\/li>\n<li>\n\t\tPreparation of coordinated electrical drawings\n\t<\/li>\n<li>\n\t\tPreparation of cable layouts for power, control and earthing for HVAC systems, industrial installations, other building services like Fire Protections System, Water Supply System and Lighting\n\t<\/li>\n<li>\n\t\tInterference management with other engineering disciplines, mechanical systems like HVAC, FPS, BMS, false ceiling levels, location and levels of RCC beams etc. while finalizing the layouts\n\t<\/li>\n<li>\n\t\tDesign and preparation of layout drawings of cable trays for HV\/ LV, power &amp; control cables\n\t<\/li>\n<li>\n\t\tCalculations for sizing, earthing, cabling, lightning protection, indoor &amp; outdoor lighting illumination, DG Sets, UPS, Battery and Battery chargers etc.\n\t<\/li>\n<li>\n\t\tPreparation of specifications, drawings, BOM, data sheets etc. for electrical motors, cables, MCC, DG Sets, UPS, Lighting Systems, Lighting Fixtures, Battery with Battery chargers and accessories\n\t<\/li>\n<li>\n\t\tDesign and preparation of layout for Control Systems Communication Systems, Data and Voice Systems, Structured Cabling Systems, networks etc.\n\t<\/li>\n<\/ul>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<p>\n\t<b>Our Service Offerings for MEP Sectors:<\/b>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\t<b>Drafting &amp; Detailing<\/b>\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Coordinated system layout drawings (2D) with interference check (3D)\n<\/p>\n<ul>\n<li>\n\t\tAcross all phases of the project including Design Development, Construction Drawings, etc.\n\t<\/li>\n<li>\n\t\tAcross all engineering disciplines including Mechanical, Fire Protection Systems, Electrical, Instrumentation and Plumbing\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Schematic layouts \/ loop drawings\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Drawing detailing including\n<\/p>\n<ul>\n<li>\n\t\tSections of critical elevations\n\t<\/li>\n<li>\n\t\tSizing, locations, installations &amp; support details\n\t<\/li>\n<li>\n\t\tTag Nos.\n\t<\/li>\n<li>\n\t\tDetailed BOM\n\t<\/li>\n<\/ul>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<ul>\n<li>\n\t\t<b>Design Development<\/b>\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Energy efficient system design\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment selection\/ sizing and finalization of specifications\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preparation of construction\/ shop drawings in coordination with building structures\/ interior layouts &amp; other services\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment schedules\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Bill of Materials for variable materials\/ items with specifications\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<ul>\n<li>\n\t\t<b>Construction Documentation<\/b>\n\t<\/li>\n<\/ul>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preparation of RFQ and detailed specifications of plant equipment \/ materials\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Tender evaluation (if-required) of plant equipment \/ materials\n<\/p>\n<p>\n\t&ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Preparation of installation\/ commissioning check documents\n<\/p>\n<ul>\n<li>\n\t\tDesign Qualification\n\t<\/li>\n<li>\n\t\tInstallation Qualification\n\t<\/li>\n<li>\n\t\tOperation Qualification\n\t<\/li>\n<li>\n\t\tPerformance Qualification\n\t<\/li>\n<\/ul>\n<p>\n\t<b>&nbsp;<\/b>\n<\/p>\n<ul>\n<li>\n\t\t<b>Preparation of O&amp;M manuals based on spare parts list &amp; Equipment details provided by vendors<\/b>\n\t<\/li>\n<li>\n\t\t<b>Preparation of as-built drawings based on site modifications<\/b>\n\t<\/li>\n<\/ul>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MECHANICAL &nbsp; HVAC High Side &ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment Selections\/ Specifications\/ Sizing &ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Plant\/ Equipment room coordinated layouts with two line piping, panels, wiring etc. &ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Plant Loop System design &ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Equipment Schedule and BOM &nbsp; Low Side &ndash;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Air System Design &hellip; <a href=\"https:\/\/gtsusainc.com\/?page_id=525\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":11,"menu_order":6,"comment_status":"open","ping_status":"open","template":"services.php","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-525","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/pages\/525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gtsusainc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=525"}],"version-history":[{"count":5,"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/pages\/525\/revisions"}],"predecessor-version":[{"id":826,"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/pages\/525\/revisions\/826"}],"up":[{"embeddable":true,"href":"https:\/\/gtsusainc.com\/index.php?rest_route=\/wp\/v2\/pages\/11"}],"wp:attachment":[{"href":"https:\/\/gtsusainc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}